Waste management used to be a concept you would only think of when you chose to recycle as opposed to throwing sustainable waste in the trash can. These days, contractors across industries are embracing the Lean methodology to identify wasted resources, and then reformat for maximum productivity and increased value.

“Optimizing the whole’ means to recognize that optimization efforts are made with consideration of the entire team and not focused on the individual.

To help recognize the various facets of Lean principles, Southland Industries Business Development Manager Henry Nutt III provides a brief run-down on the ideas behind the very human, Lean, mean building machines that are laying down the foundation for leaner building infrastructure. At Southland, Nutt explains, our first move is to ask our people how we as a company can help them.

  1. Optimizing the whole means to recognize that optimization efforts are made with consideration of the entire team and not focused on the individual.
  2. The removal of waste which starts by looking at what you do, what you do not need, and learning what brings the most value.
  3. Focus on the flow or process of how to get from point A to point B, point B to point C, and so on. Identifying flow is a proven method of maintaining workflow and productivity at maximum capacity, which means cutting things out that are not imperative for the success of the project.
  4. The ability to generate value, specifically how to bring it to the customer. This requires understanding how you identify and tailor their needs to accurately match the expectations of internal and external customers alike.
  5. Continuous improvement, which means always looking for opportunities to make gains and grow. During a project and when wrapping up a project, a good habit to get into is to identify what is currently working, what went well and what areas could be improved. This mindset of ‘post-game coverage’ will fit extremely well into the playbook for future projects that lay before you and your company.
  6. Respect for people. From the executive level to the floor level–respect your team–as they are team members that should be valued for their ideas, and when collaborating, input from the entire team is paramount for true success and effective delivery of a project.

“At Southland, our first move is to ask our people how we as a company can help them.

“This applies everywhere but specifically, as a plumbing contractor, I have to ask the people who perform the particular tasks that are related to a plumbing contract and learn how to improve from the people who are doing the work,” Nutt said.

Moving from the potential energy of lean ideas to the kinetic implementation of lean methodology can transform a business by increasing value for the customer, company and employees within.

Read more about Nutt’s Lean philosophy here

 

Tags:

  • Henry Nutt

    Sheet Metal General Superintendent

    As Sheet Metal General Superintendent for Southland’s Northern California Division, Henry Nutt is responsible for managing shop and field staff, assisting with project scheduling, personnel assignments and training, managing tools and equipment and project safety, as well as interfacing with the unions. He is directly involved with Southland’s lean construction delivery method, also is an instructor and frequent participant at the Lean Construction Institute’s quarterly trainings and an instructor at the annual LCI Congress seminar.  Mr. Nutt sits on the Lean Task Force for both SMACNA and the Association of General Contractors (AGC).   He has several published articles written on the topic of construction innovation.  As a mentor for students, Mr. Nutt is also very involved with CityBuild, a non-profit organization that prepares underprivileged San Francisco residents for employment in the trades.

  • Show Comments (0)

Your email address will not be published. Required fields are marked *

comment *

  • name *

  • email *

  • website *

You May Also Like

How Not to Mesh Up: Six Mistakes to Avoid When Generating CFD Grids

Meshing is the process of dividing fluid domain into small volumes to solve equations ...

The Evolution of the Energy Efficiency Market

Since its infancy in the 1970s with the embargo-driven energy crisis, when long gas ...

Top Six Safety Hazards on Stadium Projects

When it comes to stadium projects, no two are alike. Owners want a one-of-a-kind ...

Achieving Successful Project Outcomes with Design-Assist

The design-assist model, if done in a way where scope and responsibility are not ...

Electrical Prefabrication Rising in the Data Center Market

Containerized electrical equipment is an integrated, prefabricated enclosure containing electrical infrastructure. These exterior pre-engineered ...

The Department of Energy’s $47M Investment Signals Impending Change for MEP Providers

In April, the Department of Energy (DOE) announced the Buildings Energy Efficiency Frontiers & ...