Building Information Modeling (BIM) is a term known throughout the Architecture, Engineering, Construction and Owner-operated (AECO) industry. Its use has been so widely adopted that BIM has gone from leading edge to standard practice in just a few years. Or has it? While the use of BIM software platforms and the sharing of information among disparate project team members are all commonplace, and the advancement of technology has made design and construction projects more collaborative, efficient, and safe, one area where BIM adoption has lagged is its use with facility owners and managers. However, that is changing as more owners are leveraging the benefits of BIM – the data – for lifecycle operation and maintenance.

When the Construction Operations Building Information Exchange (COBie) was first adopted by the National Institute of Building Sciences for its National Building Information Model standard in 2011, it served as a turning point for facility owners – especially healthcare, higher education, and other institutional owners – as many began to develop their own information deliverable requirements, the intent of which is to inform designers and builders of what standard project data is expected and required to run facilities. Increasingly savvy facility owners and operators are demanding a much greater volume of more accurate data than required in the past, and they’re doing so with the understanding it is possible to get the information they need in an immediately usable format. (Gone are the days of dozens of boxes of paper piled high on wooden pallets.)

For large educational and institutional owners, the quality of data received can make or break the lifecycle performance of a building. Extensive inventorying of materials used, equipment and systems installed, and spaces built allow for the development and implementation of preventive maintenance routines, warranty-mandated services, scheduling of future equipment and material replacement, expedited response time for work orders, and improved budget forecasting for facility maintenance. The advent, and continued refinement, of BIM processes and software is empowering facility owners and managers to be more effective and efficient than ever before.

As the in-house capabilities of facility managers and owners mature, designers and builders must continue working with (and learning from) them to best understand what information is needed, when it is required, and how it will be leveraged. Doing so will lead to better quality of information throughout a project lifecycle, which, in turn, will result in more comprehensive adoption of BIM and more effective project delivery for the AECO industry.

  • Judd Fuoto

    Senior BIM Analyst

    Judd Fuoto is a Senior BIM Analyst with Southland Industries. He holds a Bachelor of Architecture from Virginia Tech, a Virtual Design and Construction certificate from the Center for Integrated Facility Engineering at Stanford University, and a Building Information Modeling certificate from the College of Built Environments at the University of Washington. Prior to Southland Industries, he was the Building Information Systems Manager at the George Washington University.

  • Show Comments (0)

Your email address will not be published. Required fields are marked *

comment *

  • name *

  • email *

  • website *

You May Also Like

Tips for a Successful Energy Savings Performance Contract (ESPC)

From lowering utility bills to modernizing buildings, reducing maintenance costs and improving the building ...

10 Aspects to Consider for Data Center Clients

Of all the data center markets throughout North America, Northern Virginia (NoVa) has consistently ...

Emphasis on Safety Culture Goes a Long Way

What does it mean to have a safety culture? At Southland, it means safety does ...

How Team Selection Can Affect Project Outcomes

Selecting the appropriate trade partners and even determining which trades should be partners is ...

The Five Minute Foreman

The Five Minute Foreman, authored by Mark Breslin, provides foremen with the tools and ...

Achieving Successful Project Outcomes with Design-Assist

The design-assist model, if done in a way where scope and responsibility are not ...